Results (
English) 2:
[Copy]Copied!
Gentlemen
Good evening ,
referring to the subject of the above please note that the cooling units in Western stores (cabbage store and Allback House)
need to switch the cooling and maintenance in order to equip the new season from 2016 to 2017
and after a traffic (with Mr. Hammoud) for examination and to the work of the season plan showing the following:
Store cabbage (old stock)
• store No. 2 cooling fan does not exist and the cooling unit does not work.
• store No. 3 compressor cooling is not cool.
• store No. 4 refrigeration compressor No. 1 does not work.
• store No. 6 does not have a compressor cooling and the second compressor is not cool due to mechanical failure.
• all refrigeration units need gas and switch filters and oil for processing for the new season 2016-2017
packaging center in Madinat Zayed (Allback House)
• 3 - conditioners do not work.
• store No. 104 refrigeration units (2) does not work.
• store No. 106 refrigerator without a fan.
• store No. 108 and cooling unit does not work.
• store No. 109 and cooling unit does not work.
Being translated, please wait..
