Results (
English) 3:
[Copy]Copied!
7 / 2 in the event that the "Lessee" of production and low production capacity of 50% authorized, for a period of more than (3). Three months, the tenant pays an amount of (2 QR / M) and two Riyals per square metre per month paid to the beginning of each month from the month (4)) fourthThe end of the month, resume production, depending on the required output power.
Being translated, please wait..
