That is after all what the clock was removed to a previous position with the settlement of the excavation site and remove waste and throw it in the places allocated for that
That is after work to return all of what has been removed to put the previous settlement with the drilling site with the removal of waste and throw it places allocated to it
That is, after the completion of the work to all been removed the previous position with a drilling site waste removal and throw it places allocated to it